Minnetonka Wood Flooring has spent more than 20 years on wood-flooring in Medina and the rest of the west metro, and the work here tends to arrive with a new house rather than an old one. A Medina owner calling us is often settling into a custom build, choosing finishes, or correcting a floor that went in fast at closing.
Our quotes are built to be read before anything is scheduled. You get a written price per square foot with the screen-and-recoat and full-sand options set next to each other, stairs priced by tread and riser, and any subfloor repair carried on its own line so it never hides inside the finish number.
On the first visit we read indoor relative humidity with a hygrometer and write the number on the quote, because a Minnesota house in furnace season runs drier than wood flooring is milled for. Finish chemistry, cure time and the day furniture, rugs and pets can return are spelled out before a sander is unloaded.
Conservation Design and the Land Around a Medina House

Clustered Lots Inside Protected Land
A newer Medina house may sit on a subdivision platted under the City of Medina’s Conservation Design planned unit development ordinance. That ordinance asks development plans to cluster lots, create contiguous habitat corridors and place certain parts of the property under conservation easements, so the houses gather together and the open ground stays connected.
The easements written under it preserve all wetlands, wetland buffers and steep slopes, plus at least 30 percent of the total buildable land area. For a buyer, the woods or marsh behind the lot are meant to stay as they are. For us, a conservation-design address usually signals a recent build, and recent builds raise their own questions about subfloors and finishes.
The Marx Property on Parkview Drive
A 2017 Minnehaha Creek Watershed District memorandum shows the ordinance at work. It describes a proposal to develop the 90-acre Marx property on Parkview Drive under the conservation-design ordinance, with proposed easements protecting 71 acres. Those acres include a 22-acre maple basswood forest and 41 acres of wetlands, among them a 6-acre tamarack swamp and a 12-acre black ash swamp.
The same property adjoins a 34-acre easement the District already held on the School Lake shoreline. We mention it because it shows the scale involved: on a parcel like that, most of the ground is spoken for before a foundation is poured. The house that eventually stands there is still an ordinary house inside, with ordinary floors.
Rural Residential and the 40-Acre Minimum
For the rural parts of the city, Medina’s 2040 Comprehensive Plan, adopted by the City Council on October 2, 2018, sets a minimum development threshold of 40 contiguous acres in the Rural Residential district. Some Rural Residential parcels between 20 and 40 contiguous acres may pursue conservation-design PUD review, which opens the clustered approach to some smaller tracts.
A long rural driveway changes logistics more than it changes the floor. We schedule material deliveries early on those sites so the flooring acclimates inside the conditioned house rather than in a garage or a cold truck, and we read the room’s relative humidity before the boxes are opened.
Looking for wood-flooring closer to Minneapolis? See Wood-Flooring Services in Minneapolis.
What a Conservation Easement Covers, and What It Leaves Alone
The Easement Governs the Land
Owners sometimes ask whether living on an easement-protected subdivision means extra approval before refinishing. The easements protect natural ground: wetlands, slopes and open acreage. They are written about land, and nothing in the ordinance language we have read speaks to the floors inside a house.
That is the limit of what we can say, and we say it plainly. Whether a particular lot carries other recorded restrictions is a question for the owner’s title documents, not for us. What stays the same is the work itself: sanding, finishing and installing a floor happen indoors, under the same building rules as any other Medina house.
Permits and the Finish-Work Exemption
Inside the house, the rules that apply are the Minnesota State Building Code as the City of Medina Building Department administers it. Minnesota Rules 1300.0120 exempts painting, tiling, carpeting and similar finish work from a building permit, and a sand-and-refinish of an existing floor is ordinarily treated as finish work of that kind.
The same rule says an exemption never authorizes work that violates the code. Once a job reaches structure, such as replacing joists or reframing a subfloor, it is building work, and the city’s building department states that permits are required whether a contractor or the homeowner performs the work. We price that structural line separately so the permit question is visible on the quote.
What We Check Instead
Rather than an easement document, the papers that matter to a floor are the ones describing the house: the build year, the flooring product, and any warranty from the builder or manufacturer. We ask for those first, because a newer house’s floor problem is often a question of how it was installed and how it has been humidified.
Then we measure. Moisture readings go on the wood subfloor with a pin moisture meter, or into the slab, and are recorded before a board goes down. Cupping, crowning and seasonal gapping each leave a pattern, and the readings tell us which one we are looking at.
A Detached, Owner-Occupied City
Who Owns the Floors Here
Census figures from the 2024 five-year American Community Survey describe a city of owners. Of Medina’s occupied housing units, 92.2 percent are owner-occupied, and 1,921 owner households, 89.3 percent of owners, live in detached houses. In a market like that, the person approving the quote usually lives on the floor.
That changes the conversation. An owner planning to stay is weighing a full sand and refinish against a screen and recoat over decades, not over a lease term, and is often willing to choose a harder species or a more durable finish for the long run. We lay out both paths on paper so the trade-off is a decision, not a guess.
Renters Live Elsewhere in the Stock
The renter side is small and shaped differently. None of Medina’s renter households live in one-unit detached houses; the 183 renter households are in attached units, three-or-four-unit buildings and larger structures. When we work in those buildings, the job looks more like a townhome or condominium project than a single-family refinish.
In attached and stacked units, we read the association documents and match the acoustic underlayment to the building before a job is scheduled. Owners in the city’s 120 owner-occupied attached homes often face the same step, because an association can set impact insulation class and sound transmission class requirements that a detached owner rarely meets.
A Young Housing Stock
Medina’s housing is recent. Of 2,412 housing units, 49.5 percent were built in 2000 or later and none before 1940, with the 2010s as the busiest decade. Pre-1978 houses are a small minority here, so the federal lead-safe work rule applies to a small share of the floors we might sand here.
When one of those older houses does come up, we sand it under the EPA Renovation, Repair and Painting rule and describe the containment by its equipment, such as sheeting, a HEPA vacuum and sealed work areas, rather than calling the job dustless. For the newer majority, the questions are about finish choice and subfloor condition instead.
Choosing Floors for a New Custom House
Species, Cut and Finish
On a new build, the owner usually chooses before the drywall dust settles. White oak remains a common choice for site-finished floors, with rift-sawn and quartersawn boards holding their shape better through seasonal swings than plain-sawn. Hickory and hard maple rate higher on Janka hardness, which matters in a house with large dogs.
Finish is the second decision. Waterborne polyurethane dries clear and fast, oil-modified polyurethane ambers and needs a longer cure time, and hardwax oil trades durability for easy spot repair. The product and sheen go on the quote by name, next to the cure schedule, so a move-in date can be planned around them.
Slabs, Radon Membranes and Subfloors
With so much of the city built recently, the assembly under a slab is a live condition here. Minnesota Rules 1303.2402 requires a gas-permeable layer under floor systems and a soil-gas membrane, lapped at least 12 inches, placed before a floor goes on or above the soil. That membrane sits below the concrete, not in place of a vapor retarder above it.
So before wood goes over concrete, we run an in-situ relative humidity test to ASTM F2170, record the result and choose a glue-down or floating system with a vapor retarder to match. Over a plywood or OSB subfloor, we check flatness and screw down any squeak or soft spot before the first board is nailed.
Living With the Floor Through Furnace Season
A new house in Medina still lives through the same heated season as an older one. Minnesota’s landlord statute treats October 1 through April 30 as the heating season, and in that stretch indoor air can fall well below the thirty to fifty percent relative humidity band most wood flooring is made for.
Seasonal gapping in winter is normal and usually closes by summer; cupping or crowning is not. A whole-house humidifier set to hold the band keeps boards closer to their equilibrium moisture content, and the humidity reading we wrote on your quote gives a baseline to compare against. A floor installed with that in mind settles into the house instead of fighting it.
- 20+ Years on Wood Floors
- Per-Square-Foot Written Quotes
- Stairs Priced Per Tread











